Highlighted below are scenarios experienced by contractors in the construction and civil engineering sector.

SCENARIO 1

COMMUNICATION PLATFORM: ADSL Line.

PROBLEM: The provider installed later than expected which raised concerns for the client. On-top-of-that, an incident occurred where the line was broken and all communication was dropped.

INEFFICIENT.

SCENARIO 2

COMMUNICATION PLATFORM: Dongles.

PROBLEM: The dongles regularly lost connection from the 3G/4G networks which caused unnecessary stress for the Site Manager as there was a breakdown in communication.


INEFFICIENT.

SCENARIO 3

COMMUNICATION PLATFORM: iPads/Tablets.

PROBLEM: The iPad was shared between trade-staff which made it difficult for the Project Manager and there wasn't any need for a cabin as the site was open for 3 months.

INEFFICIENT.

SCENARIO 4

COMMUNICATION PLATFORM: Satellite Dish.

PROBLEM: The connection was lost every time the cabin needed to be re-positioned. If the supplier couldn't send an engineer, we were without comms, sometimes for two days.

INEFFICIENT.

SCENARIO 5

COMMUNICATION PLATFORM: Smartphones.

PROBLEM: All trade-staff were using their personal devices to communicate which made the whole process very slow and the Site Manager couldn't monitor the traffic.

INEFFICIENT.

ADSL OPTION


3 MONTH WAIT, MINIMUM.
EXPENSIVE.


COSTLY AND INEFFICIENT.

SATCOM OPTION


PURCHASE ALL HARDWARE.
FIT IT.
MAINTAIN IT.

INEFFICIENT.

ROUTER OPTION


BUY A WIFI ROUTER.
USE A DATA-ONLY SIM.
HOPE IT WORKS ON SITE.

INEFFICIENT.

MULTICOM OPTION


IMMEDIATE CONNECTION.
NO MAINTENANCE.
AFFORDABLE.
FREE SUPPORT.

    EFFICIENT AND RELIABLE.

    THESE CONTRACTORS CHOSE MULTICOM - SO SHOULD YOU.

     

    This product has been added to your cart

    CHECKOUT